Mass DOT Needham Street Construction

Issue summary

The proposed project consists of Roadway reconstruction, bridge construction and signal improvements along the corridor to improve safety and operation of the corridor. Sidewalks and Bicycle accommodations consisting of a bicycle lane have been provided in accordance with applicable design guides.)
A secure right-of-way is necessary for this  project. Acquisitions in fee and permanent or temporary easements may be required. The Commonwealth of Massachusetts is responsible for acquiring all needed rights in private or public lands.  Here is a link to the Design Public Hearing, Jan 8, 2015

Comments

If you abut the Sudbury aqueduct (map on the link above), or walk it, please send us an email  saying that you support the trails! 

 

adowns@newtonma.gov